Diftah-Shis Road Tunnel

Home / International Projects / Diftah-Shis Road Tunnel

Diftah-Shis Road Tunnel

Synopsis

The DoTPS – Diftah-Shis Road Tunnel – Sharjah – Construction Project Profile contains information on the scope of the project including project overview and location. The profile also details project ownership and funding, gives a full project description, as well as information on contracts, tendering and key project contactsThe DoTPS – Diftah-Shis Road Tunnel – Sharjah – Construction Project Profile is part of World Market Intelligence’s database of 25,000+ construction projects. Our database includes a 10+ year archive of completed projects, full coverage of all global projects with a value greater than $50 million and key contact details for project managers, owners, consultants, contractors and bidders.

The road cuts through slopes, beneath the mountains and across wadis (dry riverbeds that are prone to flash flooding). The road, which is part of a strategic project to connect Sharjah to the major container port of Khor Fakkan on the Gulf of Oman coast, has seen the construction of the biggest rock tunnel in the UAE. The construction of the 1.3km twin-bore dual-carriageway road tunnel through rock has been a challenging part of this project.

The container port of Khor Fakkan is increasingly important for Sharjah and the UAE. The port is the arrival point for a variety of goods that are distributed via Sharjah throughout the Emirates. The existing road network that links the Khor Fakkan container terminal to Sharjah’s Inland Container Depot loops to the south of the mountain range and passes through Fujairah. Construction of a 26km road through the mountains virtually halves this 54km section of the route between Khor Fakkan and the city of Sharjah.

The 9km section between Diftah and Shis which includes the 1.3km tunnel is the first phase of a future 26km route.

Tunnelling through the rock has been a slow and lengthy process. Hard rock is not the only thing Halcrow’s team has had to endure. Another major obstacle is the extreme desert heat. “There is not a breath of wind up there in the summer,” says senior project manager Paul Cooper. “If you put your hand on a rock it will burn.”

Innovations

The tunnelling process adopts the New Austrian Tunnelling Method, a standard construction technique for rock tunnelling. The lining of unreinforced concrete provides a permanent supporting arch. Polypropylene fibres incorporated within the concrete mix provide fire resistance and minimise damage in the event of a fire by reducing explosive spalling of the material.

Benefits

An immediate benefit to the residents of Shis village will be realised upon completion of this project by providing a metalled road access to the village. Access to Shis is otherwise on unpaved tracks from the east coast through an enclave of the Sultanate of Oman.The main benefit will be when the whole route between Diftah and Khor Fakkan has been completed, and every container truck will have each trip reduced in length by 28km.

ِDevices Type Type Type
Quantity Quantity Quantity
Shotcrete T-260 T-263 T-262
2 1 2
Fans JF70 SF-1200 JF90
2 1 3
Inection Pump
T800 T725 Jobin
1 4 2
Equipment Accessories THP403 Nozel Plane
1 2 1